Arkana Drive Median and Road Upgrade
Due to a failing wall in the median strip of Arkana Drive in Noosa Heads, SCS were engaged to remove the existing wall and construct a new grouted rock retaining…
Infrastructure projects
Due to a failing wall in the median strip of Arkana Drive in Noosa Heads, SCS were engaged to remove the existing wall and construct a new grouted rock retaining…
SCS were engaged by Sunshine Coast Council to remediate the flooding and replace existing collapsed drainage infrastructure at Blackall Terrace, Nambour. The works included removing and upgrading the existing collapsed…
Tree clearing, bulk earthworks, rock mattress and flexible pavement, kerb, footpath, seal/AC and landscaping. The works were on an a very busy road through the café strip in Buderim. Pedestrian…
SCS were engaged by Sunshine Coast Council to complete the drainage upgrade works at Wright Street, Maroochydore. The existing stormwater infrastructure was failing which was leading to flooding of the…
SCS were engaged by Noosa Council for the upgrade of stormwater infrastructure at Goodchap Street, Noosaville. Works included new DN600 stormwater pit and pipe network, removal of existing drainage and…
SCS were engaged by McConnell Dowell to undertake the civil works component of the Aura and Harmony Trunk Infrastructure Works. Our scope included several packages including; Aura and Landsborough Reservoir…
As the principal contractor, SCS were engaged for the construction of a new carpark including 90 new parking bays requiring earthworks, pavement construction (permeable pavers), road works, GPT installation, stormwater…
SCS were engaged by Sunshine Coast Council to undertake the stabilisation works of Petrie Creek Road, Nambour. This section of road had been subject to significant eroding and was subject…
SCS were engaged for the removal and reconstruction of 2 culvert crossings damaged due to flooding. Two large culvert road crossings were damaged on a rural road Golden Gully Road,…
SCS were engaged by Sunshine Coast Council for the upgrade of Commissioners Flat Road, Peachester. Works were required to be completed in separate stages to ensure that traffic was maintained…